Machine Shop 2
Lathe Operations - Project
Back to the Projects

Lathe Operations - Project:
Installing and Removing Work-holding Devices

Part # PS

Part DescriptionInstalling and Removing Work-holding Devices

Quantity Req.: 1

Name _________________________

Date: ________________

PLEASE HAVE YOUR INSTRUCTOR INITIAL AND DATE THE GREY BOXES (*) AFTER THE REQUIRED OPERATIONS.

Step# Location  Description  Initials  Date
10 the instructor Have the instructor  select a lathe with a threaded spindle nose.
20 Lathe Remove work-holding device. Use a lathe board. Clean mating surfaces. Replace work-holding device.
30 the instructor Have the instructor  check your work. Be prepared to answer questions concerning your procedures. *  
40 the instructor Have the instructor  select a lathe with a Camlock spindle nose.
50 Lathe Remove work-holding device. Use a lathe board. Clean mating surfaces. Replace work-holding device.
60 the instructor Have the instructor  check your work. Be prepared to answer questions concerning your procedures. *  
70 the instructor Have the instructor  select a lathe with headstock centers and sleeves in place.
80 Lathe Remove these work-holding devices. Use a lathe board. Clean mating surfaces. Replace work-holding devices.
90 the instructor Have the instructor  check your work. Be prepared to answer questions concerning your procedures. *