Lathe Operations - Project 3-3
Chuck Turning

Part # PSN3#3

Part Description: Crank Handle

Quantity Req.: 1

Name _________________________

Date: ________________

PLEASE HAVE YOUR INSTRUCTOR INITIAL AND DATE THE GREY BOXES (*) AFTER THE REQUIRED OPERATIONS.
Click here to view the part specification. 

Step# Location  Description  Initials  Date
10 Instructor Secure stock from the instructor. *  
20 Lathe  Chuck stock and center to within 0.002.
30 Lathe  Face end to clean up.
40 Lathe Center drill with #4 center drill.
50 Lathe Drill with the correct size drill for machine reaming a 0.375 hole.
60 Lathe Set up for machine reaming. Use a floating reamer holder. Be ready to answer questions regarding R.P.M.
70 Instructor Have the instructor check set up. *  
80 Lathe Ream the 0.375 hole.
90 Lathe Set up to counterbore.
100 Lathe Counterbore 0.28 deep.
110 Lathe Break sharp corners.
120 Lathe Turn part and chuck to within 0.002.
130 Lathe Set compound for turning taper.
140 Lathe Turn 20 degree taper.
150 Lathe Deburr and break sharp edges.
160 Bench Inspect part.
170 Instructor Turn in your work for grading. *