Machine
Shop 2 |
|
Lathe Operations
- Project 2-1 |
|
| Part # PSN2#1
Part Description: O. D. Threading Quantity Req.: 1 |
Name _________________________
Date: ________________ |
PLEASE HAVE INSTRUCTOR INITIAL AND DATE GREY BOXES (*), AFTER REQUIRED
OPERATIONS
Click Here to view the Part
Specification
| Step# | Location | Description | Initials | Date |
| 10 | Lathe | Setup part between centers using a dead center in the tailstock. Make sure to use the proper lubricant on the dead center. | ||
| 20 | Lathe | Check lathe setup for runout and taper. | ||
| 30 | Lathe | Setup lathe to cut the first thread. Be ready to answer questions concerning half nut lever engagement. | ||
| 40 | Instructor | Have instructor check setup | * | |
| 50 | Lathe | Take a light scratch cut. Insure that the pitch is correct. | ||
| 60 | Lathe | Take rough thread cutting passes until you are within 0.010 of finish size. Check pitch diameter using pitch micrometers or other thread measuring instrument. | ||
| 70 | Lathe | Take finish cuts of 0.001-0.002 until the gage or pitch micrometer indicates a class 3 fit. | ||
| 80 | Lathe | Continue prior procedures for the rest of the threads. Use a split nut when clamping on the finished thread end. | ||
| 90 | Lathe | Deburr thread crests and starts. If filing thread crest be careful not to take too much off. | ||
| 100 | Lathe | Inspect part and turn in for grading. | * |