Machine Shop Home  
  Introduction  |   Shop Safety  |   Layout  |   Inspection  |   Bench  |   Cutting Fluids  |   Sawing  |  Drilling

Cutting Fluids - Project 1
Cutting Fluid Home

Part # Cutting Fluids

Part Description:Coolant Inspection/Change 

Quantity Req.: 1 machine

Name _______________________ Date: _____________

PLEASE HAVE INSTRUCTOR INITIAL AND DATE  GREY BOXES (*), AFTER REQUIRED OPERATIONS

Step# Location  Description  Initials  Date
10 Machine Laboratory Using Refractometer locate a machine in need of coolant maintenance.
20  Instructor  Have Instructor check refractometer reading and determine the needed maintenance procedure. *  
30 Selected Machine Perform maintenance to the coolant system.
40 Selected Machine Mix new coolant to machining operation requirements.
50 Instructor Turn in for grading. *