![]() |
Machine Shop Home | ||
| Introduction | Shop Safety | Layout | Inspection | Bench | Cutting Fluids | Sawing | Drilling | |||
|
Cutting
Fluids
- Project 1 |
| Part # Cutting Fluids
Part Description:Coolant Inspection/Change Quantity Req.: 1 machine |
| Name _______________________ | Date: _____________ |
PLEASE HAVE INSTRUCTOR INITIAL AND DATE GREY BOXES (*), AFTER REQUIRED OPERATIONS
| Step# | Location | Description | Initials | Date |
| 10 | Machine Laboratory | Using Refractometer locate a machine in need of coolant maintenance. | ||
| 20 | Instructor | Have Instructor check refractometer reading and determine the needed maintenance procedure. | * | |
| 30 | Selected Machine | Perform maintenance to the coolant system. | ||
| 40 | Selected Machine | Mix new coolant to machining operation requirements. | ||
| 50 | Instructor | Turn in for grading. | * | |