![]() |
|
Machine Shop Home | |
|
| |||
| Introduction | Shop Safety | Layout | Inspection | Bench | Cutting Fluids | Sawing | Drilling | |||
|
Sawing Machines
- Project 2-2 |
|
| Part # PS2
Part Description: Tool Grinding Gage Quantity Req.: 1 |
|
| Name _______________________ | Date: _____________ |
PLEASE HAVE YOUR INSTRUCTOR INITIAL AND DATE THE GREY BOXES
(*) AFTER THE REQUIRED OPERATIONS.
Click here to view the part
specification.
| Step# | Location | Description | Initials | Date |
| 10 | Vertical Band Saw | Remove the blade as shown in the information sheet. | ||
| 20 | Instructor | Have your instructor check off blade removal. | * | |
| 30 | Instructor | Secure stock. | ||
| 40 | Vertical band saw | Set up the saw for cutting out the gage. Be prepared to answer questions concerning safety, blade speed, and blade guides. | ||
| 50 | Instructor | Have your instructor check set up. | * | |
| 60 | Vertical band saw | Saw out the gage to within 0.03 inches of the layout lines. Do not touch the layout lines. | ||
| 70 | Bench | Deburr the gage, but DO NOT remove the layout dye. | ||
| 80 | Instructor | Turn your work into your instructor for grading. | * |