Machine Shop Home  
  Introduction  |   Shop Safety  |   Layout  |   Inspection  |   Bench  |   Cutting Fluids  |   Sawing  |  Drilling

Layout - Layout Tool Bit Grinding Gage -Project 2
Layout Home

Part # PS#2

Part Description: Layout V-Block Clamps

Quantity Req.: 1

Name _______________________ Date: _____________

PLEASE HAVE INSTRUCTOR INITIAL AND DATE  GREY BOXES (*), AFTER REQUIRED OPERATIONS
Click Here to view the Part Specification

Step# Location  Description  Initials  Date
10 Instructor Obtain the correct size stock for the V-Block Clamps. *  
20 Bench Using a file, deburr the stock.
30 Belt Sander Lightly belt sand one end square (if necessary).
40 Work Bench File one end smooth and square, deburr. Check with a solid square. Sides should be Square within 1/64-inches.
50 Work Bench Layout work according to dimensions using the centerline of the clamps as the datum. Lines should be sharp and singular. Radii should blend with lines.
60 Instructor Turn in part for inspection *